竣工验收 | completion check and acceptance |
隐蔽工程 | hidden parts |
索赔事项 | claims |
竣工结算 | final account |
并网发电 | grid-connected power generation |
施工力能 | energy and gases supply for construction |
性能验收试验 | performance acceptance test |
物资 | materials |
业主方 | the Owner |
接收证书 | acceptance certificate |
技术培训 | technical training |
进度计划 | schedule |
暂停施工 | suspension |
调试 | commissioning |
光缆 | optical cable |
施工图设计文件 | construction drawing design documents |
总体设计 | overall design |
监理工程师 | supervision engineer |
交叉施工 | alternative construction |
合同转让 | Contract assignment |
利害关系 | have stakes in |
并网 | grid connection |
环评 | EIA |
验收 | acceptance |
构件 | component |
工程质保金 | quality guarantee deposit |
技术交底 | technical clarification |
财产管理人 | receiver |
财产委托人 | entrusted person |
建设工程 | construction work |
组件 | component |
单位工程 | unit project |
分部工程 | sub-unit project |
分项工程 | constituent project |
单项工程 | single construction |
见证点 | witness point |
停工待检点 | hold point |
上一篇:农业生产与加工行业专业术语 ——来自国译翻译公司
下一篇:建筑工程专有名词2 ——来自国译翻译公司整理
国外文化背景知识在口译中也很重要,那么口译员平时应当如何加强这方面的知识积累呢?需要通过大量的阅读吗? 知识积累肯定需要通过多听多
——教你一眼识别靠谱翻译机构的5大标准在国际交流日益频繁的今天,无论是企业出海、留学申请、合同洽谈还是论文发表,都离不开专业的翻译
商务签证是企业家、投资者及商务人士前往海外进行商业活动的重要通行证。在申请过程中,许多关键材料需要进行翻译,以确保符合大使馆、移民